
Wiring, heat dissipation, aiming angle, waterproofing — a checklist from our engineering team to avoid the most common installation mistakes.
LED flood lights look simple to install and are consequently one of the most common sources of callbacks. Eight checks before you start will prevent almost all of them.
First, confirm the supply voltage and whether the chosen model is single or multi-voltage. Second, check the total load against the circuit and protection device, and confirm the cable gauge over the actual run length, not the nominal one. Third, verify the IP rating matches the mounting position — a fixture under a soffit sees far less water than one at ground level.
Fourth, plan heat dissipation. Flood lights need clearance around the housing and must not be recessed into insulation or enclosed in a sealed void. Fifth, aim the fixture before final tightening, and confirm the required tilt against the photometric data rather than by eye. Sixth, check that the mounting surface and bracket will carry the fixture weight plus wind load, particularly on high mast and pole installations.
Seventh, make every cable entry genuinely waterproof using the supplied connector rather than sealant. Eighth, record the final aiming angles and DMX addressing, so that when a fixture is eventually replaced it goes back in the right place. Getting these eight points right takes an hour and saves a maintenance visit.

Send us your facade drawings or reference photos — we'll reply with a fixture layout proposal and quotation within 24 hours.